Using electrochemical inhibition
(scale buildup) on working surfaces of subsurface equipment always shadows the oil production process.




No special preparation of equipment is required to apply this coating. The coating shall be applied by maintainers at manufacturing sites without any extra safety requirements.
A well with experimental ECP coating was shut down after 285 days in service. The shutdown was due to wellwork, i.e., the well ran normally right up to the shutdown. No scaling was discovered on the ESM body or on the operative parts of the ECP.

ECP after 608 days in service. The overhaul was due to wellwork, i.e., the well ran normally right up to the shutdown. No ECP scaling was discovered.